{"id":200,"date":"2022-09-16T13:29:19","date_gmt":"2022-09-16T13:29:19","guid":{"rendered":"https:\/\/www.dmr.eu\/equipment\/?page_id=200"},"modified":"2023-06-08T16:11:11","modified_gmt":"2023-06-08T16:11:11","slug":"automated-soil-water-sampling","status":"publish","type":"page","link":"https:\/\/www.dmr.eu\/technologies\/soil-water-sampling\/automated-soil-water-sampling\/","title":{"rendered":"Automated soil water sampling"},"content":{"rendered":"\n

The installation and equipment for automated soil water sampling is developed and optimized for deep installations (>5 m b.g.l.). The biggest challenge we have circumvented when performing deep installations is that we apply vacuum for extraction of the pore water, but also for elevating the water to the sampling at ground level. As it is only possible to lift water 10 m with vacuum and we also need vacuum capacity for water extraction, this is a limitation without a special installation technique which is illustrated in the figure above. As shown in the figure, we install a 110 mm pipe down to roughly 1 m above the installation depth. Then we lower the sampling bottle through the pipe, down to approximately 2 m above the installation depth. This means that we have plenty of vacuum left for soil water extraction. Using this technique, we have no limitations on how deep we can install.<\/p>\n\n\n\n

The installation technique also ensures that it is possible to install soil water samplers in unsaturated layers below secondary aquifers. This is also illustrated in the figure above, where we install the sampler in moraine clays below water bearing sand intrusions. When we install the 110 mm pipe, we make the drilling (6\u201d) as a cased borehole. Then we install the 110 mm pipe and make a water impermeable plug between the casing and the pipe using a suspension of cement and bentonite (39 % – 61 %). After this the casing can be pulled up, and the last m to the installation depth is drilled using a 4\u201d drill. From our experience, a cement plug of at least 1,5 m between the water bearing layer and the bottom of the 110 m pipe is necessary to ensure a tight plug. The complete installation procedure can be found here<\/a>.<\/p>\n\n\n\n

Each sampling point consist of:<\/p>\n\n\n\n